![Hwy 50 Brewery Construction Photos](https://hwy50brewery.com/wp-content/uploads/2018/09/Construction-Pics-head-1.jpg)
- Stairway to craft beer heaven!
- Steel tables now in place with front-row view into the brew house.
- Shiny steel wall behind the mash tun and boil kettle.
- Steel-top bar is ready for detail work.
- View past the bar to the kitchen.
- Indoor ovens for pizza made fresh using our own chef-made dough.
- Comcast is here installing internet and phone access.
- These are exactly what you think they are.
- Hand-crafted locally, the main Hwy 50 Brewery door installed.
- Out back and waiting for Hwy 50 Brewery signage, an old grain silo faces the actual Highway 50. If you spot it, tell us on facebook.com/hwy50brewery.
- New address numbers signal we’re ready for Google maps!
- Gary Ritz, Hwy 50 Brewer, with new team-member, Dusty.
- Iconic grain silo now stands near the road.
- New Camino landmark, our grain silo means “You’ve arrived at your destination.”
- Future bar and customer service counter.
- Another view of bar/counter.
- Light fixtures wired up and glowing.
- Chairs and bar stools have arrived!
- Outdoor pizza oven to be installed on the patio. Can’t wait to fire it up!
- Patio sunshade and lights.
- Our hand-crafted “front door” in place, awaiting custom glass.
- From the patio: grain silo with vineyards, tress and view beyond.
- In the beginning, completely demolishing and clearing out the interior. This is OUR space now!
- Plumbing is complete. Filling the trenches.
- The rock wall getting close to finished.
- Nello moves rocks!
- Loading the first of the brewery parts onto the truck bed.
- Mash tun and boiler loaded.
- Brewery equipment loaded and ready for transport to Camino.
- Bringing the brewery home!
- Picking up the fermenters in Reno.
- Brewery equipment sits ready to assemble.
- Unloading the brite tanks.
- Assembling the brewery while framing continues.
- Framing is taking shape.
- Installing the big roll-up doors.
- Coming soon sign.
- Framing is almost complete.
- Everything goes by the master plans!
- Drywall work is coming along.
- Gary making sure every brewery detail is right.
- Interior paint day.
- View to the inside with roll-up doors open.
- The concrete block patio deck is really taking shape.
- Stairs and hand rails awaiting finish work.
- The view from Carson Rd. is looking good.
- Looking through thick glass into the brewery. A view future guests will enjoy.
- Brite tanks installed in the cold room.
- Stacks of future beer! An exciting day when this was delivered.
- The brewery is assembled and close to brew-ready!