Stairway to craft beer heaven!
-
Steel tables now in place with front-row view into the brew house.
-
Shiny steel wall behind the mash tun and boil kettle.
-
Steel-top bar is ready for detail work.
-
View past the bar to the kitchen.
-
Indoor ovens for pizza made fresh using our own chef-made dough.
-
Comcast is here installing internet and phone access.
-
These are exactly what you think they are.
-
Hand-crafted locally, the main Hwy 50 Brewery door installed.
-
Out back and waiting for Hwy 50 Brewery signage, an old grain silo faces the actual Highway 50. If you spot it, tell us on facebook.com/hwy50brewery.
-
New address numbers signal we’re ready for Google maps!
-
Gary Ritz, Hwy 50 Brewer, with new team-member, Dusty.
-
Iconic grain silo now stands near the road.
-
New Camino landmark, our grain silo means “You’ve arrived at your destination.”
-
Future bar and customer service counter.
-
Another view of bar/counter.
-
Light fixtures wired up and glowing.
-
Chairs and bar stools have arrived!
-
Outdoor pizza oven to be installed on the patio. Can’t wait to fire it up!
-
Patio sunshade and lights.
-
Our hand-crafted “front door” in place, awaiting custom glass.
-
From the patio: grain silo with vineyards, tress and view beyond.
-
In the beginning, completely demolishing and clearing out the interior. This is OUR space now!
-
Plumbing is complete. Filling the trenches.
-
The rock wall getting close to finished.
-
Nello moves rocks!
-
Loading the first of the brewery parts onto the truck bed.
-
Mash tun and boiler loaded.
-
Brewery equipment loaded and ready for transport to Camino.
-
Bringing the brewery home!
-
Picking up the fermenters in Reno.
-
Brewery equipment sits ready to assemble.
-
Unloading the brite tanks.
-
Assembling the brewery while framing continues.
-
Framing is taking shape.
-
Installing the big roll-up doors.
-
Coming soon sign.
-
Framing is almost complete.
-
Everything goes by the master plans!
-
Drywall work is coming along.
-
Gary making sure every brewery detail is right.
-
Interior paint day.
-
View to the inside with roll-up doors open.
-
The concrete block patio deck is really taking shape.
-
Stairs and hand rails awaiting finish work.
-
The view from Carson Rd. is looking good.
-
Looking through thick glass into the brewery. A view future guests will enjoy.
-
Brite tanks installed in the cold room.
-
Stacks of future beer! An exciting day when this was delivered.
-
The brewery is assembled and close to brew-ready!